Systemair supplied the complete car park ventilation of Marsa Arabia Kempisky Hotel Island Resort in The Pearl
Marsa Arabia Kempisky Hotel Island Resort, Qatar
Systemair delivered a complete product range for the hotel’s car park ventilation with superior technical features, supported by solid after-sales support during installation and commissioning phases. The company benefited from its reputation as a trusted supplier, having supplied many iconic projects across Qatar.
The project had a short timeframe, and it was crucial for the delivery to meet sensitive deadlines to ensure there were no delays in the project.
Systemair has built a foundation of trust in the country from previous collaborations with the stakeholders and a long history of projects in the country.
The project had a requirement for a number of products to meet all the requirements of the car park ventilation’s design.
Construction Development Company (CDC)
Dar Al-Handash Consultant
United Development Company (UDC)
With a total built-up area of 157,000 m2, Marsa Arabia Resort was designed to be a 5-star Hotel Apartments and Residence with resort amenities, offering views of the crystal-blue Persian Gulf. The resort is located on Marsa Arabia Island, which is formed and surrounded by stone and accessible by a bridge from the Porto Arabia Retail District to the west.
The project required a complete car park ventilation system that will ensure reliable operations and meet the requirements of local codes and the facility's world-class standards. The project was initiated in the last quarter of 2019 and had strict delivery timelines.
Systemair had to tackle competitor prices, which was a challenge. The company was eventually awarded the contract based on the available product range's technical compliance and innovative features.
“It is an honour to be part of such iconic projects and to be in partnership with leading companies in the constructions sector in Qatar. We are delighted to see our products chosen over competitors due to our solutions, technical compliance, and the engineering support of our dedicated team of experts. Through the concerted efforts of our colleagues in sales and the factory, we were able to deliver the required solutions according to the client’s budget and wishes.”
General Manager, Systemair Qatar
Systemair supplied the project with the following:
AXC 1250 2-speed fans
AXC 900 2-speed fans
AJR 400 2-speed Jet fan (28.3/1.7kW)
CO control system (MSR brand)
3 nos. GDC-06 CO control panel
65 nos. of CO detectors
Systemair Qatar became the supplier of choice because the company had established a good reputation in Qatar, owing to the company’s participation in many iconic projects in the past. Systemair is listed on the vendor list. Systemair and CDC, the main contractor for the project, has also maintained a strong business relationship over a long period, stemming from successful joint projects together.
For more information, contact Diyaa Al Jbaie, General Manager, Systemair Qatar: diyaa.al.jbaie@systemair.qa +974 6605 7193